Quizzer – AFAR – Standard Costing
Quiz Summary
0 of 2 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 2 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 2
1. Question
The following information summarizes the standard cost for producing one metal tennis racket frame. In addition, the variances for one month’s production are given. Assume that all inventory accounts have zero balances at the beginning of the month:
Standard Cost Per Unit Standard Monthly Cost
Materials P 4.00 P 8,400
Direct labor 2 hrs. @P2.60 5.20 10,920
Factory overhead:
Variable 1.80 3,780
Fixed 5.00 10,500
Variances:
Materials price, P261,75 unfavorable
Materials quantity, P560.00 unfavorable
Labor rate, P520.00 unfavorable
Labor efficiency, P2,000.00 unfavorable
What were the actual direct labor hours worked during the month?
CorrectIncorrect -
Question 2 of 2
2. Question
The following information summarizes the standard cost for producing one metal tennis racket frame. In addition, the variances for one month’s production are given. Assume that all inventory accounts have zero balances at the beginning of the month:
Standard Cost Per Unit Standard Monthly Cost
Materials P 4.00 P 8,400
Direct labor 2 hrs. @P2.60 5.20 10,920
Factory overhead:
Variable 1.80 3,780
Fixed 5.00 10,500
Variances:
Materials price, P261,75 unfavorable
Materials quantity, P560.00 unfavorable
Labor rate, P520.00 unfavorable
Labor efficiency, P2,000.00 unfavorable
What were the actual quantities of materials used during the month?
CorrectIncorrect